|
Avery Point
Lighthouse - APLS
|
![]() Ceiling inside the Lantern Room |
![]() Joseph Gnazzo measures for the next piece of molding |
![]() Jim out on the parapet |
![]() Refurbished walls and a new copper drain pipe in Watchstanders room |
![]() Tools being used to install moldings |
![]() New windows, clean walls and fresh paint on ladder |
![]() Jim descends down the ladder from the Lantern Room |
![]() Copper grounding wire, copper drain pipe and electrical entr |
![]() Jim with new front door waiting to be installed |
![]() Avery Point Light |
![]() Work continuing at Avery Point |
![]() Avery Point Light |
![]() Avery Point Lantern Room |
![]() Avery Point Light |