
Ceiling inside the Lantern Room |

Joseph Gnazzo measures for the next piece of molding |

Jim out on the parapet |

Refurbished walls and a new copper drain pipe in
Watchstanders room |

Tools being used to install moldings |

New windows, clean walls and fresh paint on ladder |

Jim descends down the ladder from the Lantern Room |

Copper grounding wire, copper drain pipe and electrical
entr |

Jim with new front door waiting to be installed |

Avery Point Light |

Work continuing at Avery Point |

Avery Point Light |

Avery Point Lantern Room |

Avery Point Light |